Rowan Construction Group construction team

How long does a home renovation take - Written Fixed-Price Quotes, Permits Handled

Free on-site estimate and a written, line-item quote before any work begins. One contract, one crew, one accountable point of contact. Licensed, insured, permits handled.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

Your dream remodel for as low as $199/month*on approved credit; ask for current terms
Styles & brands we work with

Kitchen remodeling
Kitchen remodeling
Bathroom remodeling
Bathroom remodeling
Home additions & ADU
Home additions & ADU
Roofing
Roofing
Windows & doors
Windows & doors
Driveway & pavers
Driveway & pavers
Fence
Fence

Before & after – our own jobs

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

How Long Does a Home Renovation Take?

A home renovation takes anywhere from a few days to several months, depending on the scope of the work, the condition of what’s behind the walls, and how well the project was planned before the first tool was picked up. A bathroom refresh with new tile and fixtures might wrap in one to two weeks. A full kitchen remodel, a home addition, or an ADU can run three to six months or longer. The single biggest driver of a renovation running long is not the complexity of the work itself – it is the absence of a written scope before the project starts.

Call (470) 298-9650

When a contractor begins without a fixed written plan, every decision that comes up mid-project becomes a negotiation. A new countertop edge profile, an unexpected rotted subfloor, a window that needs to be upsized for code – any of these can stretch a project by days or weeks if the process for handling changes is not already in place. At Rowan, no work proceeds on a change until the change order is signed. That one administrative habit is the reason projects finish within a few percent of the agreed cost and the agreed timeline.

Why It Happens

The scope was never fully defined before work started

If the original quote was a ballpark number rather than a written, line-item scope, the contractor is effectively making decisions as they go. You can spot this pattern early: the quote arrived fast, there was no walk-through, and the contract language included phrases like “allowances” or “to be determined.” Every undefined item is a future delay. When something surfaces mid-project that was not accounted for, the work stops while the contractor figures out what to do – and you wait.

Permit timelines were not built into the schedule

Structural work, electrical upgrades, plumbing relocations, and home additions almost always require permits. Permit review timelines vary by jurisdiction, but they are rarely fast, and they are completely outside a contractor’s control once the application is submitted. If the contractor did not sequence the permit into the schedule from the start, the crew may be ready to work on a Monday and legally unable to touch anything until an inspector signs off two weeks later. A realistic timeline accounts for this in writing before the first day on the job.

Material lead times were treated as estimates, not facts

Custom cabinetry, special-order windows, specific tile patterns, engineered lumber – all of these have lead times that fluctuate. A contractor who orders materials at the same time work begins is gambling that everything arrives on schedule. When it does not, the crew either sits idle or pivots to other tasks in a sequence that was not designed to work that way. Before a project starts, Rowan confirms lead times and orders materials so that when demolition is done, the next phase is already on site or en route.

Conditions behind the walls were not anticipated

Older homes and homes that have been renovated before frequently reveal surprises once demolition starts: water-damaged framing, outdated wiring that cannot support the new layout, plumbing that was never up to code. These are real problems that require real time to address. The difference between a contractor who handles this well and one who does not comes down to documentation. A thorough pre-project assessment – including photos of what was found and a written scope that identifies known risks – gives everyone an honest baseline. Surprises still happen; what should not happen is that the homeowner hears about them for the first time through a verbal call asking for more money.

What to Do Right Now

Contractor applying mortar with a notched trowel for kitchen tile installation
What to Do Right Now
  • Collect every piece of paper related to your current or planned project. The contract, the quote, any emails where scope changes were discussed. If critical decisions were made verbally, write down what you remember while it is fresh. This documentation matters if there is a dispute.
  • Write down what was promised and by when. Make a list of every milestone your contractor committed to – demo, rough work, inspections, finish work, punch list. If no milestones were ever given, that itself is diagnostic information.
  • Photograph the current state of the work area. Date-stamped photos of what is done, what is not done, and anything that looks incomplete or wrong give you an objective record. Your Rowan technician does this on every visit as a standard deliverable; you should do the same if you are already mid-project with another contractor.
  • Do not authorize additional costs verbally. If someone asks you to approve extra work or extra spend in a phone call or a text conversation, tell them you need it in writing before anything proceeds. This is not difficult to ask for, and any contractor who refuses is telling you something important.
  • If electrical, structural, or gas work is sitting open or incomplete, stop using that area of the home. Exposed wiring, open framing around a gas line, or an unsupported load-bearing wall are not conditions to work around while you wait for the contractor to return. Call your local Rowan Construction Group team to assess the situation before anyone is inside that space.
BeforeBefore
AfterAfter

How We Fix It

When your local Rowan Construction Group team arrives, the first thing that happens is a documented assessment – photos, measurements, and a review of whatever plans or prior work exist. We are looking at what was promised, what was delivered, and what the honest path to completion looks like from where the project stands today.

From there, a written scope is built. Flat price, written scope, written warranty – that is Clause 1 of the Haven Standard, and it applies whether we are starting a project from scratch or picking up one that stalled. No number gets spoken out loud and then later disputed; it goes on paper before any work begins.

Depending on what is needed, this may involve our Kitchen Remodeling, Bathroom Remodeling, Home Additions, Roofing, or Windows and Doors crews – or a combination across trades. The written estimate tells you exactly who is doing what and in what order. The 365-Day Done Right Promise is printed on every agreement: if it is not done right, we make it right. Call (470) 298-9650 to schedule your free written estimate.

Frequently Asked Questions

Contractor installing a stone countertop onto new kitchen cabinets
Frequently Asked Questions

Get the price in writing before anything starts.A real person answers, day or night.
Call now

Get It Fixed

Your local Rowan Construction Group team handles renovation timelines, stalled projects, and new starts – all with a written price before any work begins. Call (470) 298-9650 or book online. A live person answers every call, and your free written estimate is the first step.

Written by Grant Rowan, Owner at Rowan Construction Group, serving communities nationwide since 2007.

What Our Customers Say

★★★★★ 4.7 from 7+ reviews

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

- Xavier L.

"Good communication throughout. Weekly written update meant I never had to chase them."

- Nadine G.

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

- Reggie O.
Need Construction help nationwide? Licensed & insured · Free on-site estimates response · free estimates
Call (470) 298-9650

Current Offers

Bring these savings to your next appointment.

Free On-Site Estimate & Written Quote

No obligation. We measure, price the job in writing, and the quote is yours to keep.

Expires Mar 31, 2027
Always

Written Price Before Any Work Starts

Expires Mar 31, 2027
Free

Free Second Opinion on Any Written Estimate

Expires Mar 31, 2027
Included

Documented Photo Record on Every Visit

Expires Mar 31, 2027

Request a Free Estimate

Tell us what's going on in Beverly Hills - we'll get back to you fast. No obligation.

By providing your information above, you agree to the terms of our Privacy Policy and consent to being contacted via phone, email, or SMS about your request, including by the independent contractors we may refer it to.

Prefer to text? Send a Text
Call Now - Fast Dispatch
Areas We Serve
Call Now - Fast Dispatch