A living room with a wall of new windows and a sliding glass door

Therma-Tru Home Additions & ADU Nationwide

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansOur technicians have up to 19 years of experience
New double-hung windows in a dining room
A new front entry door with glass sidelights
A new curved paver walkway to the front porch
A galley kitchen opened up to the dining room with a new peninsula
A walk-in shower with large-format tile and a built-in niche
A remodeled family room with new windows and a window seat
A standing-seam metal roof over a covered porch
A new wood side gate with black hardware
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Therma-Tru Home Additions & ADU: The Los Angeles Owner’s Guide

Home additions and ADUs built around Therma-Tru entry systems in Los Angeles typically run $53,100-$153,400 installed, depending on square footage, foundation work, and whether the existing Therma-Tru door and frame can be reused or needs reframing. We carry Therma-Tru-compatible rough openings, sill pans, and weatherstripping on hand so the door-to-wall transition stays sealed from day one. Most owners discover their addition or ADU has a problem the same way: a door that suddenly drags, daylight visible around the frame, or a floor that slopes toward the new wing after the first rainy season.

Call (470) 298-9650

That last one is the one we get called about most. Los Angeles soil expands and contracts with wet-dry cycles, and a poorly tied addition will telegraph that movement straight through the door frame. If your Therma-Tru door worked fine in October and binds in February, the issue is rarely the door. It’s what the door is attached to.

Which Therma-Tru Models This Applies To

A new multi-panel patio door opening a kitchen to the patio

Therma-Tru builds entry doors in several series: Classic-Craft, Fiber-Classic, Smooth-Star, and Pulse. The door itself is the easy part to identify. Open it and look at the hinge edge for a white label with the series name, manufacturing date, and a nine-digit order code. That code tells us the door slab dimensions, the hinge prep, and whether the frame was ordered with a brickmold or a flush exterior. Here’s the gotcha: Therma-Tru’s frame systems changed in 2017. Pre-2017 frames were built to fit 4-9/16″ rough walls. Current production defaults to 6-9/16″ to accommodate 2×6 construction, which is now standard for ADUs in Los Angeles under Title 24 energy requirements. If your addition was framed with 2×6 walls and you reuse a pre-2017 frame, you’ll end up with an awkward interior jamb extension. If you frame 2×4 and buy a new 6-9/16″ frame, the brickmold will stick out past your stucco. Both are avoidable if you measure the rough opening before the door is ordered.

For OEM versus aftermarket: Therma-Tru’s warranty covers the door slab and frame when installed per their published instructions, which include a specific sill pan detail and fastener pattern. Aftermarket weatherstripping and threshold caps are fine. Aftermarket door slabs claiming to fit any Therma-Tru frame are not fine, because the hinge pocket locations differ by series. We spec OEM slabs and frames, and use aftermarket only for trim, seals, and hardware where it genuinely does not matter.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Signs Your Therma-Tru Home Additions & ADU Is Failing

  • The door binds at the top latch-side corner in wet months. The addition’s foundation or floor framing is moving independently from the original structure. The door is the indicator, not the cause.
  • Daylight visible around the frame after the first winter rains. The rough opening was oversized or the sill pan was skipped. Water intrusion through the threshold rots the subfloor under the door, and by the time you see it from inside, the damage is already spreading.
  • Hairline cracks running diagonally from the door’s top corners into the stucco or drywall. Classic differential settlement between the original structure and the new addition. In Los Angeles, this often traces to foundation footings that were not deepened to account for the retaining wall or slope the addition sits on.
  • The door swells or smells musty after rain. The addition’s flashing detail at the roofline is letting water into the wall cavity, and it is running down to pool at the door header. Fix the flashing first, then the door. Replacing the door alone just moves the problem to the next wet season.
  • The deadbolt no longer lines up with the strike plate without lifting the handle. Door slab sag from hinge wear is normal after a decade. But if the whole frame has shifted, the hinges are fine and the structural tie between the addition and the original wall is not.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Replacement Cost & What’s Included

Installers setting a new window and checking it for level

For a Therma-Tru entry door replacement within a larger addition or ADU project in Los Angeles, the door portion of the work typically runs $5,310-$17,700 installed. That includes the OEM slab and frame, new sill pan, sealing, interior casing, and exterior trim. The broader price range of $53,100-$153,400 reflects the full addition: foundation and structural tie-in, framing, roofing, electrical rough-in and finish, HVAC, drywall, and the Therma-Tru door system as one integrated component.

What drives the range: square footage, whether you need a new foundation or can build on an existing slab, the condition of the wall you are tying into, and whether the ADU needs separate utility connections and a new service panel. Every quote we write is a flat price with a written scope and a written warranty. Under Clause 1 of the Haven Standard, the price is written before anyone starts. If a change comes up mid-project, no work proceeds until the change order is signed. That is not a slogan. It is the reason our projects finish within a few percent of the agreed number.

Key Takeaways:

  • Installed price range for a Therma-Tru door on an addition or ADU: $5,310-$17,700
  • Full addition or ADU project range: $53,100-$153,400
  • Written flat price and scope before any work begins, every time
  • Done Right Promise: if it is not done right, Rowan makes it right

DIY or Call Us?

There are two things an owner can safely check before calling. First, open and close the door and watch the gap between the slab and frame. If the gap is even on both sides and the door only drags at the bottom, it may be a simple hinge adjustment or a threshold cap replacement. Second, look at the exterior sill. If the sill pan is missing or the caulking at the brickmold has failed, that is the water entry point. You can recaulk that yourself in an afternoon.

What you should not do is attempt to reframe a rough opening, cut into a load-bearing wall, or reflash the roofline. Los Angeles building code requires permits for structural changes on additions and ADUs, and the seismic tie-down requirements are specific. A door in a new addition is not hanging on a simple framed opening; it is sitting in a wall that has to resist lateral loads for the whole structure. Frame it wrong and the door will never close right, no matter how well it is hung. We pull the permits, we pass the inspections, and we document every visit with a photo record. Call (470) 298-9650 if the door is moving with the wall, not just sagging on its hinges.

FAQs

A new paver patio with a seat wall and fire pit

Getting started with Rowan

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Find your local team

Each location is independently owned and works to the same written standard. Enter your ZIP code to reach yours.

A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help nationwide? Licensed & insured · free written estimates
Call (470) 298-9650
Areas We Serve

Request a Free Estimate

Tell us what you need - Rowan Construction Group responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch