Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
ActiveYards Fence Installation: The Los Angeles Owner’s Guide
ActiveYards fence installation in Los Angeles typically runs $4,130 to $10,620 for a complete post-and-panel system, with most jobs falling between $5,000 and $7,500 depending on linear footage, gate hardware, and substrate conditions. We stock ActiveYards-compatible posts, panels, and gate kits on our trucks, and we can usually complete a standard residential installation in one to two days once materials are on site. Most owners call us after a gate starts dragging, a post leans in soft soil after winter rain, or a panel separates at the top rail and starts rattling against the pickets whenever the Santa Anas kick up.
What you’re dealing with is rarely a single broken part. ActiveYards systems are modular, which means one failed component, usually a bottom rail or a degraded post insert, puts stress on everything attached to it. The fix is not a patch; it’s matching the exact series, getting the post depth right for your soil, and squaring the frame before the first fastener goes in. That’s the work we do.
Which ActiveYards Models This Applies To
ActiveYards breaks its product line into aluminum fence series that look similar at a glance but do not share parts. The Everyday, Dogwood, and Brookline lines each use different post profiles, rail brackets, and picket spacing. A Brookline bottom rail will not seat into an Everyday post, and forcing it is how you end up with a bowed run and a gate that binds after two weeks. Before we order or install anything, we check the printed label inside the top rail or on the hinge side of the gate frame. That label carries the series name and the picket code. If the label is gone or faded, which happens fast in Los Angeles sun, we measure picket width and post face dimensions and match from there.
One compatibility gotcha we see regularly: ActiveYards changed its post cap design between production years on the Everyday series. Pre-2018 posts take a cap with a deeper skirt; newer posts use a shallower profile. They are visually close, but an old cap on a new post leaves a gap that collects irrigation water and accelerates rail corrosion. We keep both cap styles on the truck because this exact mismatch shows up on roughly one in five repair calls in Los Angeles. For owners weighing OEM versus aftermarket, our honest position is this: ActiveYards’ factory rails and brackets are worth the upcharge because the alloy and powder coat are consistent, which matters on a system meant to stay square for 20 years.
Signs Your ActiveYards Fence Installation Is Failing

- Gate drags or scrapes the latch side. This usually means the hinge post has shifted out of plumb, often because the original installer set it in less than 24 inches of concrete or skipped gravel drainage at the base. Los Angeles clay expands when wet and contracts when dry; a shallow post in that soil walks a little further every season.
- Pickets rattle against the top rail when you close the gate. The picket has come loose from its retaining clip or the rail has developed play at the bracket. Left alone, the picket chafes through the powder coat and you get bare aluminum, then oxidation, then a picket that pops out entirely.
- White chalky residue on rails or posts. That is oxidation forming where the factory powder coat has been scratched or worn thin, often on the bottom rail from a weed trimmer or on the latch face from repeated contact. In Los Angeles’s dry climate it does not rust like steel, but it spreads under the coating and eventually flakes it off in sheets.
- Post leaning at the base but still plumb at the top. This is a classic frost heave pattern in colder climates; in Los Angeles it is irrigation overspray. Constant moisture softens the soil around the concrete footer, and the post begins to lean toward the saturated zone.
- Section between two posts sags visibly. The bottom rail has crept out of its bracket, which can happen when the original installer did not fully seat the rail or when the bracket screws stripped. The panel loses its tension brace and the whole section can fold if a child climbs it.
Before
AfterReplacement Cost & What’s Included
ActiveYards fence installation in Los Angeles runs $4,130 to $10,620 for a full project. At the low end, you are looking at a straight run with no gate, around 80 to 100 linear feet, with standard Everyday panels and post spacing at the manufacturer’s maximum. At the high end, you have multiple gates, maybe a custom-width panel, a long run with slope adjustments, or footers that require more depth because of loose or saturated soil. We write the price as one flat number before work starts: materials, labor, haul-away of the old fence, and concrete are all in the quote. No change order ever gets approved verbally; if we open a post hole and hit something unexpected, you sign the change order before we spend an extra dollar. Workmanship is covered under our 365-Day Done Right Promise, and ActiveYards’ own materials warranty applies to the panels and posts, which we will document for you in writing.
We also install fences for KraftMaid, Cambria, and Silestone owners when those projects call for it, but ActiveYards is the aluminum line we see most often in Los Angeles backyards, and the one we keep deepest in stock.
DIY or Call Us?

You can safely check a few things yourself. Confirm the series name on the rail label. Look at whether the gate hinges are pulling away from the post or the post itself is moving. Snap a photo of the post base and the latch line, and measure the distance between posts. That is useful information before anyone arrives.
What you should not DIY is pulling and resetting a post, because a post hole in Los Angeles can hide a gas line, a root system, or a cracked irrigation main, and because the post needs to be set plumb in freshly mixed concrete with proper drainage, not packed with the old dirt you dug out. Same warning goes for the gate: a an-aluminum gate carries a lot of leverage, and a spring-loaded hinge or sagging post under tension can snap shut hard enough to break a hand. We have the equipment, the depth gauges, and the background-checked crew to do this without turning a weekend project into a liability. If you want to talk it through, call (470) 298-9650 and ask for a written estimate. We will not give you a number over the phone without seeing the fence, and we will not start a tool until you have the price in writing.
Measure twice, say it once, show your work. That is how we run every ActiveYards installation in Los Angeles.
FAQs
An ActiveYards fence installed with proper post depth and drainage will last 20 to 25 years or more in Los Angeles, because the dry climate and low humidity slow the oxidation that kills these systems elsewhere. The weak points are not the panels but the post bases and gate hinges, which is why we set posts below the irrigation line and check gate hardware on every service visit.
Yes, individual sections, rails, posts, and gate hardware can be repaired or swapped without replacing the entire fence, as long as we can match the series and picket code. We will tell you directly if a repair is throwing good money after bad, and that happens when more than a third of the posts show movement or the powder coat is failing across whole panels.
Most ActiveYards fence installations in Los Angeles take one to two days once materials are on site, depending on linear footage, gate count, and what we find in the post holes. Removal of an old fence and haul-away are included in that timeline.
We keep common ActiveYards Everyday and Brookline rails, brackets, post caps, and gate hardware on our trucks, which resolves most repair calls the same day we diagnose the problem. If we need a less common series part, we order it direct and install it within the week, and you get the delivery date in writing before we start.
If your fence problem is not covered here, call (470) 298-9650. A live person answers 24/7, and we will schedule a look at your fence with a written estimate before any work begins.
Written by Grant Rowan, Owner, Rowan Construction Group at Rowan Construction Group, serving Los Angeles and nearby areas.







Before
After
Before
After